How Does the Prefabricated House Manufacturing Process Progress?

Prefabricated houses have become popular by providing a fast and economical solution for modern living needs. So, how does the manufacturing process of these houses progress? Prefabricated house manufacturing is carried out quickly and under control through fabrication processes. Here are the step-by-step stages of the prefabricated house manufacturing process:

For Reliable, Durable, and Aesthetic Structures, Choose Vision Steel
- Vision Steel

1. Design and Planning

The first stage of prefabricated house construction is design and planning. Architectural drawings are made, and necessary details are determined based on the customer's needs. This process clarifies details like the layout of rooms, materials used, and the size of the house. Projects are also prepared according to local regulations and customer requirements.

2. Material Selection and Preparation

After the design process, material selection is made. In prefabricated houses, steel, wood, glass, and insulation materials are commonly preferred. Material quality is crucial for the durability and insulation properties of the house. Selected materials are prepared for the production process.

3. Production and Component Preparation

The components of the prefabricated house are produced in the factory. All elements, like wall panels, roof, and floor modules, are manufactured according to predetermined dimensions. These parts undergo quality control processes in the factory environment, ensuring that each component meets high-quality standards.

4. Transport and Assembly

The completed parts are transported to the location where the prefabricated house will be assembled. Special precautions are taken to prevent damage to the parts during transport. The assembly process begins by joining the parts on a pre-prepared foundation. The assembly teams meticulously place each component.

5. Interior Finishing

After the exterior structure is completed, interior work begins. Electrical, plumbing, and insulation installations are done. Wall, floor, and ceiling coverings are added. Finally, areas like the kitchen and bathroom are completed, making the house ready for use.

6. Final Inspection and Delivery

After the assembly is completed, final inspections are conducted. During the quality control phase, all systems are tested, and compliance with customer expectations is evaluated. After making the necessary adjustments, the prefabricated house is delivered to the customer.